Re: [HTCondor-devel] Scheduler reports MAX_JOBS_RUNNING reached when it hasn't been


Date: Thu, 14 Nov 2013 16:00:43 -0500
From: Ben Cotton <ben.cotton@xxxxxxxxxxxxxxxxxx>
Subject: Re: [HTCondor-devel] Scheduler reports MAX_JOBS_RUNNING reached when it hasn't been
On Thu, Nov 14, 2013 at 1:22 PM, John (TJ) Knoeller <johnkn@xxxxxxxxxxx> wrote:
> try
>  condor_status -schedd -af:h ShadowsRunning ShadowsRunningPeak
>
It looks like those were added in 7.7 and this is a 7.6 schedd. On the
other hand, now I have good leverage to push them to upgrade. I'll see
if I can get them to sign off on that and if the behavior persists
post-upgrade, I'll report back with the peak shadows running.


Thanks,
Ben Cotton


-- 
Ben Cotton
main: 888.292.5320

Cycle Computing
Leader in Utility HPC Software

http://www.cyclecomputing.com
twitter: @cyclecomputing
[← Prev in Thread] Current Thread [Next in Thread→]