On 06/15/2016 01:08 PM, R. Kent Wenger wrote: > The proposed change is that, if DAGMan is "stuck" because all queued > node jobs are on hold (and there are no ready jobs, running PRE/POST > scripts, etc.), DAGMan will consider this a failure and abort the DAG > (which results in all queued node jobs being removed, and a rescue DAG > being generated). What about an equivalent of PeriodicRemove that we could set to e.g. (time() - QDate) > 360 -- Dimitri Maziuk Programmer/sysadmin BioMagResBank, UW-Madison -- http://www.bmrb.wisc.edu
Attachment:
signature.asc
Description: OpenPGP digital signature