Hello,If I have two DAGs running on the same Condor farm and containing both the line
MAXJOBS SPECIAL_CATEGORY 1
will the number of SPECIAL_CATEGORY jobs be limited to 1 per DAG, or to 1 overall?
Thanks in advance for the clarification! Cheers, Nicolas