And hi again, I have just realized, that a trace job by me run on the CE under the job id 562.0 - but on the sched it seems to be under the id 563.0 [1]. Since /usr/bin/condor_ce_history seems to be just calling condor_history with an updated environment, I had assumed, that both IDs should be in sync. Or are running the CE's and Schedd's IDs out of sync, if one submits a job directly on the Schedd? Cheers, Thomas [1, condor job] GlobalJobId = "grid-htcondorce0.desy.de#563.0#1596631626" Iwd = "/var/lib/condor-ce/spool/562/0/cluster562.proc0.subproc0" [1, CE job] GlobalJobId = "grid-htcondorce0.desy.de#562.0#1596631619" Iwd = "/var/lib/condor-ce/spool/562/0/cluster562.proc0.subproc0"
Attachment:
smime.p7s
Description: S/MIME Cryptographic Signature