[HTCondor-users] Force dag to continue after periodic_remove
- Date: Wed, 7 May 2014 20:31:24 -0400
- From: "ASHIKUZZAMAN IDRISY" <aui109@xxxxxxx>
- Subject: [HTCondor-users] Force dag to continue after periodic_remove
Hi,
Thank you very much, this solution
worked. I should have thought of this, having re-checked the manual for DAGs
(http://research.cs.wisc.edu/htcondor/manual/v8.0/2_10DAGMan_Applications.html), I found this line: "If the job fails and there is a POST script, node failure is determined by the exit value of the POST script. "
Thus, I basically made a POST script that simply echo-ed something, and the subsequent jobs, B1-B600 were started.
Thanks again,
Ash
Is there a way to force periodic_remove or something similar, to act like a
success in the eyes of the dag, so that subsequent jobs get completed?
You can add a POST script to your 20 A1... A20 node that turns a periodic remove into a success. You can do something like this in your DAG file: Script Post A1 my_test.pl $JOBID$JOBID will expand to the condor ID of the job.So then your post script can do a condor_history command on the job -- if JobStatus is 3 that means removed -- I don't know if you can distinguish from a periodic remove vs. a "manual" remove... You may need to do a little digging to figure that out.Kent WengerCHTC Team
Ashikuzzaman Idrisy