On 7/28/2012 7:13 AM, Rita wrote:
Lets say we have 5 jobs, Job A A.condor Job B B.condor Job C C.condor Job D D.condor Job E E.condor Is it possible to have the entire dag fail if Job C (or whichever) fails? BTW, these are all independent jobs.
I think the textbook setup is to have a Job X that does nothing much and then add PARENT Job CHILD X for each of your jobs. Then X will fail if any of them fails.
Dimitri