Re: [Condor-users] dagman: Possible to run a "PRE" script on same node as the main program will run?
- Date: Fri, 23 Jul 2010 08:49:08 -0500
- From: "Timothy St. Clair" <tstclair@xxxxxxxxxx>
- Subject: Re: [Condor-users] dagman: Possible to run a "PRE" script on same node as the main program will run?
If the job is broken into a DAG where jobA (accessDB) has concurrency
limits, and jobB (operate) has no limits, I believe this should work.
Cheers,
Tim
On Fri, 2010-07-23 at 15:34 +0200, Carsten Aulbert wrote:
> Hi Tim
>
> On Friday 23 July 2010 15:24:09 Timothy St. Clair wrote:
> > You may want to check out (concurrency limits):
> > http://www.cs.wisc.edu/condor/manual/v7.5/3_13Setting_Up.html#36823
>
> I've briefly looked at that before and would have wished there was a solution
> which the user herself could set.
>
> However, I don't think this will help me much, as the user's job will copy
> data to the local node which should take a couple of minutes and then should
> run for 1-2 hours on this data. With concurrency limits I will only limit the
> total number of jobs as I still cannot tell Condor that only the copying job
> needs to be limited, not the CPU intensive follow-up job, right?
>
> Thus with concurrency limits I would maybe prevent an inrush at the start of a
> job cluster, but when most nodes are busy with CPU, no more network I/O
> intensive jobs would be able to run even if some CPU cores were idle as the
> limit has been reached.
>
> Do you agree?
>
> Cheers
>