I have two condor pools, one is for production the other one
is for development. If I want to send some jobs from one pool to get executed
in the other pool or both at the same time, how can I do that? Thanks in advance for your help. Respectfully, Alex Alas Systems Administrator Tel. 301-948-8550 x219 Fax 301-963-2064 E-mail: aalas@xxxxxxxxxxxxx
Website: http://www.fugroearthdata.com |