If I was wanting to have a hard limit on the length of time that a job
can run and set that to 48 hours how would I do that?
I know I can set MaxJobRetirementTime to some releatively small time,
say 72 hours, but I am guessing that I need to set some sort of
preempt
expression that is time based.
Anyone have a recipe for doing this? ie putting a hard time limit on
all
jobs on the cluster of some specific time?
See the periodic_remove submit command:
http://www.cs.wisc.edu/condor/manual/v6.7/condor_submit.html#53487
You can use that to kill a job that's run longer than you want.