Can any one tell me if it is possible to restrict the running time of a job in condor, by forcing check point or kill of the job at the end of a time, say T.
Is it possible just by configuring a classad expression, or does condor as any special facilities for this ?
http://www.cs.wisc.edu/condor/manual/v6.7/condor_submit.html
http://www.cs.wisc.edu/condor/manual/v6.7/3_6Startd_Policy.html
-alain