Re: [Condor-users] Job run time limit ?


Date: Fri, 04 Feb 2005 07:35:18 +0000
From: Mark Calleja <M.Calleja@xxxxxxxxxxxxxxx>
Subject: Re: [Condor-users] Job run time limit ?
Alain Roy wrote:

> Condor 6.7 can deal with this much better than Condor 6.6 if your job is in the vanilla or Java universes:
> you can set it up so that a temporary network outage doesn't cause the job to stop, but will only cause a
> failure if the outage lasts longer than a certain time that you specify.


How exactly does one set this? A quick trawl through the 6.7 manual didn't prove very fruitful, so a pointer to the relevant entry would be much appreciated.

Cheers,
Mark


[← Prev in Thread] Current Thread [Next in Thread→]