| Date: | Fri, 04 Feb 2005 07:35:18 +0000 |
|---|---|
| From: | Mark Calleja <M.Calleja@xxxxxxxxxxxxxxx> |
| Subject: | Re: [Condor-users] Job run time limit ? |
Alain Roy wrote: > Condor 6.7 can deal with this much better than Condor 6.6 if your job is in the vanilla or Java universes: > you can set it up so that a temporary network outage doesn't cause the job to stop, but will only cause a > failure if the outage lasts longer than a certain time that you specify. How exactly does one set this? A quick trawl through the 6.7 manual didn't prove very fruitful, so a pointer to the relevant entry would be much appreciated. Cheers, Mark |
| [← Prev in Thread] | Current Thread | [Next in Thread→] |
|---|---|---|
| ||
| Previous by Date: | [Condor-users] Kerberos on Tru64, Miskell, Craig |
|---|---|
| Next by Date: | [Condor-users] "Claimed Idle" state on XP execute nodes, sched still thinks they're running, Mark Calleja |
| Previous by Thread: | [Condor-users] Job monitor installation steps for Linux Fedora Core 3, Dave Lajoie |
| Next by Thread: | Re: [Condor-users] Job run time limit ?, Matt Hope |
| Indexes: | [Date] [Thread] |