At NIKHEF we are seeing more and more GPU usage, and often those jobs
have quite a long preprocessing stage to reformat the training inputs or
other data files takes quite some time compared to the total runtime of
the slot.
As a result of this we end up with slots that do request a GPU but don't
actually use it for a big part of the claimed period what results in non
optimal GPU usage.
Now copying this prepared data back to a network storage, and then copy
it back to the scratch disk of the slot with a GPU is a bit waist full
of network bandwidth.
So i was wondering if it would be possible to have in a DAG or some
other way, a CPU intensive preproccessing job running on a node with a
GPU, and later in the process attaching the GPU to this slot or having
a way to have a internal copy between the two jobs.
Any other suggestions that would work with the current limitations of
condor are also more then welcome, (by for example having a node local
scratch and having some constraints the jobs run after each other, altho
then you miss the cleanup that condor does of the scratch)
Emily Kooistra